Inspections for the day of: Thursday, February 8, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03155 BLD-Foundation2/8/20012/8/20012/8/2001 12:00:00 AMAPART
Added by Inspector: 340 On 2/8/2001 10:12:02 AM partial pour back bldg; setting bolts...appears 30" sst bolts used at hd's, watch connections for proper install as bolts actually larger than req'd.
BLD00-03174 BLD-Conference2/8/20012/8/20012/8/2001 12:00:00 AMAPART
Added by Inspector: 340 On 2/8/2001 10:43:03 AM w/ truss bldr; will fax info
BLD00-03480 BLD-Conference2/8/20012/8/20012/8/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 2/8/2001 10:56:52 AM w/ RonH. & bldr supt...add'l area to be"mech. room" or accessible.
BLD00-00514 BLD-Framing/Rough-in2/8/20012/8/20012/8/2001 12:00:00 AMAPART
Added by Inspector: 340 On 2/8/2001 10:58:08 AM wip; keep c/n. complete firestopping, etc.
BLD00-02347 BLD-Conference2/8/20012/8/20012/8/2001 12:00:00 AMAPART
Added by Inspector: 340 On 2/8/2001 11:04:40 AM keep c/n, coil strap installed at south side roof...wip
BLD00-02752 BLD-Conference2/8/20012/8/20012/8/2001 12:00:00 AMAPART
Added by Inspector: 340 On 2/8/2001 11:07:19 AM w/ supt re fire rated windows...req'd at n. & e. sides, rated assy needed
BLD00-01772 BLD-Final2/7/20012/8/20012/8/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/07/2001 at 14:57:58. Contact: ###-####....nr, need elec 2/8/2001 10:01:45 AM
BLD00-03031 BLD-Foundation2/7/20012/8/20012/8/2001 12:00:00 AMAPART
John Wyman ###-####, ext "ramp" wall 2/8/2001 10:51:52 AM
BLD00-03031 BLD-Framing/Rough-in2/7/20012/8/20012/8/2001 12:00:00 AMAPART
t duct 2/8/2001 12:09:21 PM
BLD00-03650 BLD-Framing/Rough-in2/8/20012/8/20012/8/2001 12:00:00 AMPPART
###-#### chk, complete guardrail at final 2/8/2001 5:05:37 PM
BLD01-00275 BLD-Final2/8/20012/8/20012/8/2001 12:00:00 AMPPART
###-####, roof complete, looks ok 2/8/2001 5:03:37 PM
BLD00-02996 BLD-Framing/Rough-in2/7/20012/8/20012/8/2001 12:00:00 AMPNR
###-####
BLD99-03383 BLD-Conference2/8/20012/8/20012/8/2001 12:00:00 AMPPART
Added by Inspector: 340 On 2/8/2001 4:25:07 PM gave list of questions for clarification to proj. eng'r re floor penetrations
BLD01-00195 BLD-Conference2/8/20012/8/20012/8/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 2/8/2001 5:09:12 PM called, owner to cancel insp, nr
BLD00-01150 BLD-Conference2/8/20012/8/20012/8/2001 12:00:00 AMPPART
Added by Inspector: 340 On 2/8/2001 5:23:18 PM w/ Darren, Mike Mullin,etc. at city, need verify approvals w/ other insp's