BLD00-03155
| BLD-Foundation | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 2/8/2001 10:12:02 AM partial pour back bldg; setting bolts...appears 30" sst bolts used at hd's, watch connections for proper install as bolts actually larger than req'd.
|
BLD00-03174
| BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 2/8/2001 10:43:03 AM w/ truss bldr; will fax info
|
BLD00-03480
| BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/8/2001 10:56:52 AM w/ RonH. & bldr supt...add'l area to be"mech. room" or accessible.
|
BLD00-00514
| BLD-Framing/Rough-in | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 2/8/2001 10:58:08 AM wip; keep c/n. complete firestopping, etc.
|
BLD00-02347
| BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 2/8/2001 11:04:40 AM keep c/n, coil strap installed at south side roof...wip
|
BLD00-02752
| BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 2/8/2001 11:07:19 AM w/ supt re fire rated windows...req'd at n. & e. sides, rated assy needed
|
BLD00-01772
| BLD-Final | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 14:57:58. Contact: ###-####....nr, need elec 2/8/2001 10:01:45 AM
|
BLD00-03031
| BLD-Foundation | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
John Wyman ###-####, ext "ramp" wall 2/8/2001 10:51:52 AM
|
BLD00-03031
| BLD-Framing/Rough-in | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
t duct 2/8/2001 12:09:21 PM
|
BLD00-03650
| BLD-Framing/Rough-in | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
###-#### chk, complete guardrail at final 2/8/2001 5:05:37 PM
|
BLD01-00275
| BLD-Final | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
###-####, roof complete, looks ok 2/8/2001 5:03:37 PM
|
BLD00-02996
| BLD-Framing/Rough-in | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | NR |
|
|
###-####
|
BLD99-03383
| BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/8/2001 4:25:07 PM gave list of questions for clarification to proj. eng'r re floor penetrations
|
BLD01-00195
| BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/8/2001 5:09:12 PM called, owner to cancel insp, nr
|
BLD00-01150
| BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/8/2001 5:23:18 PM w/ Darren, Mike Mullin,etc. at city, need verify approvals w/ other insp's
|