ELE00-04281
| Final | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PASS |
|
|
###-####. completed. 2/8/2001 9:51:36 AM
|
ELE01-00247
| Rough-In Permanent Service | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 12:47:38. Contact: ###-####. single family residense.
p/s ug n phil baker #0247
quail ridge sub no. 07 Lot: 21 Block: 5 2/8/2001 9:24:55 AM
|
ELE01-00357
| Electrical Rough-In | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
R/I KELLY ###-#### . p.v.c. conduit in trench ok. 2/8/2001 11:19:15 AM
|
ELE00-03407
| Final | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | NR |
|
|
Tom ###-####. sump-pump circuit not completed, will reschedule 2/8/2001 10:42:50 AM
|
ELE01-00027
| Final | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
###-#### OR ###-####. 2/8/2001 3:03:43 PM temporary occupancy: check ground bushings and bonding in gutter/ services panels. also, sign company not finished with sign installation. 2/8/2001 3:06:39 PM
|
ELE01-00384
| Electrical Rough-In | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PASS |
|
|
###-####. walls ele r/i ok. 2/8/2001 3:37:29 PM
|
ELE00-04740
| Final | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | CANC |
|
|
###-####. C.O.W. Will discuss main service with jfrank and jschmer. 2/8/2001 2:02:00 PM
|
ELE01-00413
| Final | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | NR |
|
|
Paul ###-#### hot tub+ After 2:00 please homeowner will be home. spa bonding not completed; (motor),; exterior light fixture being re-located. 2/8/2001 4:14:31 PM
|