BLD00-03348
| BLD-Framing/Rough-in | 2/6/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PART |
|
|
###-####
interior walls ok to cover on phase 2, need to verify bracing of walls later @ ceiling grid inspection, also corridor compliance 2/8/2001 11:28:57 AM
|
BLD00-03640
| BLD-Final | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | A | PASS |
|
|
fn insp jeff-- ###-####
c of c # 19893 issued 2/7/2001 2:15:38 PM
|
BLD00-02824
| BLD-Framing/Rough-in | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 10:25:07. Contact: ###-####.
c/n posted, ok to insulate 2/8/2001 2:01:19 PM
|
BLD00-02726
| BLD-Final | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 11:02:43. Contact: ###-####.
c of c # 19878 issued, need to paint when weather permits 2/8/2001 2:44:17 PM
|
BLD00-03627
| BLD-Foundation | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
###-####
wip 2/8/2001 2:31:09 PM
|
BLD01-00164
| BLD-Framing/Rough-in | 2/7/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 15:05:34. Contact: ###-####.
plumbing to be rouphed in later, still able to see b4 tile// ok to cover w/ verbal corrections on straps, post under floor for point loads (2) 2/8/2001 3:20:13 PM
|
BLD01-00188
| BLD-Foundation | 2/8/2001 | 2/8/2001 | 2/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 07:32:08. Contact: .
wip 2/8/2001 2:31:24 PM
|