BLD00-03361
| BLD-Conference | 2/8/2002 | 2/8/2002 | 2/11/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 340 On 2/8/2002 11:31:54 AM ...unable to contact 2/11/2002 2:34:00 PM
|
BLD01-03206
| BLD-Other | 2/7/2002 | 2/8/2002 | 2/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 09:28:56. Contact: ###-####. ok to side. 2/8/2002 11:23:27 AM
|
BLD01-03203
| BLD-Other | 2/7/2002 | 2/8/2002 | 2/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 09:29:58. Contact: ###-####.ok to side 2/8/2002 11:23:15 AM
|
BLD01-03205
| BLD-Other | 2/7/2002 | 2/8/2002 | 2/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 09:30:43. Contact: ###-####...shear panels ok...add fasteners at sills, ok to side. 2/8/2002 11:23:05 AM
|
BLD00-03729
| BLD-Conference | 2/8/2002 | 2/8/2002 | 2/8/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/8/2002 9:32:40 AM w/ Bruce re corrections
|
BLD00-02394
| BLD-Conference | 2/8/2002 | 2/8/2002 | 2/8/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 340 On 2/8/2002 11:30:27 AM
|
BLD98-03705
| BLD-Conference | 2/8/2002 | 2/8/2002 | 2/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 2/8/2002 11:34:46 AM 2pm at PDS, excavation permit modification to follow per Marlene; rec'd eng's soils test approval. 2/8/2002 4:25:28 PM
|
BLD01-00539
| BLD-Framing/Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 12:00:00 AM | P | NR |
|
|
###-#### DAN; need eng's approval re seismic upgrade, verify other ok's. recall. 2/8/2002 5:37:01 PM
|
MEC02-00321
| Pressure Test | 2/4/2002 | 2/8/2002 | 2/6/2002 12:00:00 AM | A | CANC |
|
|
Disp set to [CANC] by a contractor via Hello! on 02/06/2002 at 17:14:29.
|