Inspections for the day of: Friday, February 8, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03361 BLD-Conference2/8/20022/8/20022/11/2002 12:00:00 AMPNR
Scheduled by Inspector: 340 On 2/8/2002 11:31:54 AM ...unable to contact 2/11/2002 2:34:00 PM
BLD01-03206 BLD-Other2/7/20022/8/20022/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/07/2002 at 09:28:56. Contact: ###-####. ok to side. 2/8/2002 11:23:27 AM
BLD01-03203 BLD-Other2/7/20022/8/20022/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/07/2002 at 09:29:58. Contact: ###-####.ok to side 2/8/2002 11:23:15 AM
BLD01-03205 BLD-Other2/7/20022/8/20022/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/07/2002 at 09:30:43. Contact: ###-####...shear panels ok...add fasteners at sills, ok to side. 2/8/2002 11:23:05 AM
BLD00-03729 BLD-Conference2/8/20022/8/20022/8/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/8/2002 9:32:40 AM w/ Bruce re corrections
BLD00-02394 BLD-Conference2/8/20022/8/20022/8/2002 12:00:00 AMPNR
Scheduled by Inspector: 340 On 2/8/2002 11:30:27 AM
BLD98-03705 BLD-Conference2/8/20022/8/20022/8/2002 12:00:00 AMPPASS
Scheduled by Inspector: 340 On 2/8/2002 11:34:46 AM 2pm at PDS, excavation permit modification to follow per Marlene; rec'd eng's soils test approval. 2/8/2002 4:25:28 PM
BLD01-00539 BLD-Framing/Rough-in2/7/20022/8/20022/8/2002 12:00:00 AMPNR
###-#### DAN; need eng's approval re seismic upgrade, verify other ok's. recall. 2/8/2002 5:37:01 PM
MEC02-00321 Pressure Test2/4/20022/8/20022/6/2002 12:00:00 AMACANC
Disp set to [CANC] by a contractor via Hello! on 02/06/2002 at 17:14:29.