Inspections for the day of: Friday, February 8, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02141 BLD-Conference2/7/20022/8/20022/8/2002 12:00:00 AMADONE
Scheduled by a contractor via Hello! on 02/07/2002 at 11:55:39. Contact: ###-####. will resume work this spring 2/8/2002 11:18:16 AM
MEC01-03778 Final2/7/20022/8/20022/8/2002 12:00:00 AMANR
###-####
MEC01-03778 Rough-in2/8/20022/8/20022/8/2002 12:00:00 AMAPASS
Added by Inspector: 425 On 2/8/2002 11:19:27 AM ok to install ceiling
MEC02-00351 Final2/8/20022/8/20022/8/2002 12:00:00 AMPPASS
###-#### before 3 please, homeowner has to leave at 3:20 pm thanks
BLD01-03209 BLD-Final2/8/20022/8/20022/8/2002 12:00:00 AMPPASS
###-#### CALL 1ST
BLD02-00025 BLD-Conference2/8/20022/8/20022/8/2002 12:00:00 AMPDONE
Scheduled by Inspector: 425 On 2/8/2002 12:34:13 PM stairs need to be redone also need 2/8/2002 4:01:19 PM eng on truss that was cut up by stairs 2/8/2002 4:02:25 PM
MEC02-00375 Pressure Test2/8/20022/8/20022/8/2002 12:00:00 AMPPASS
Added by Inspector: 425 On 2/8/2002 2:36:22 PM
MEC02-00375 Rough-in2/8/20022/8/20022/8/2002 12:00:00 AMPPASS
r/i leo ###-####
MEC02-00334 Rough-in2/7/20022/8/20022/8/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/07/2002 at 15:37:26. Contact: ###-####.