Inspections for the day of: Wednesday, February 8, 2006.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01669 FIRE-Final Inspection2/8/20062/8/20062/8/2006 4:35:17 PMPFAIL
Need fire life safety review comments. Fire dept access signage is an issue as well as one additional emergency light is required in the fire sprinkler riser room. The fire sprinkler permits need finaling as well. The big issue with it is the riser room was required to be one hour rated and it is not. No inspection was done on the fire sprinkler system.
FIR05-00415 INSP-Final Inspection2/8/20062/8/20062/8/2006 2:54:52 PMPFAIL
Underground supply from the tee in the crawl space and the backflow preventor are the incorrect size.
FIR05-00761 FIR-Aging Inspection2/8/20062/8/20062/8/2006 12:16:09 PM NR
Work is in progress
BLD05-01785 FIRE-Sprinkler Rough-in2/7/20062/8/20062/8/2006 11:35:49 AMACANC
jack ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD05-00748 FIRE-Final Inspection2/7/20062/8/20062/8/2006 11:15:45 AMAFAIL
Mount the fire extinguisher and provide approved door hardware per the approved plans for the two doors that are not the main exit
FIR05-00415 INSP-Final Inspection2/7/20062/8/20062/8/2006 10:43:48 AMAFAIL
Could only do the flush which passed since there were no appoved plans
BLD05-01784 FIRE-Sprinkler Rough-in2/7/20062/8/20062/8/2006 12:00:00 AMACANC
jack ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie//Cancelled per client due to wrong type of insp 2-8-06 eus
BLD04-02020 FIRE-Final Inspection2/7/20062/8/20062/7/2006 4:19:57 PMAPART
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected.
BLD05-03008 FIRE-Final Inspection2/7/20062/8/20062/7/2006 4:09:53 PMAPART
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected.