ESC07-00852
| Site Preparation | 2/8/2008 | 2/8/2008 | 2/11/2008 10:04:37 AM | P | FAIL |
|
|
Site must be cleared of all debris. All disturbed soil must be stabilized. There is a vegitative buffer along Division Ave. But along alley way the soil has not been cleared of debris and has not been stabilized. 8-17 ordinance requires to do so.
|
ESC06-00334
| Random Inspection | 2/8/2008 | 2/8/2008 | 2/8/2008 2:57:32 PM | P | CANC |
|
|
|
ESC06-00334
| Site Preparation | 2/8/2008 | 2/8/2008 | 2/8/2008 2:43:08 PM | P | CANC |
|
|
Duplicate
|
ESC08-00046
| Site Final | 2/7/2008 | 2/8/2008 | 2/8/2008 2:40:41 PM | A | CANC |
|
|
Korey Phone #: ###-#### Dupication
|
ESC08-00046
| Site Final | 2/8/2008 | 2/8/2008 | 2/8/2008 2:27:30 PM | A | PASS |
|
|
|
ESC07-00819
| Random Inspection | 2/8/2008 | 2/8/2008 | 2/8/2008 2:02:11 PM | P | CANC |
|
|
Wrote a Notice of Correction: 1. Construction Entrance 2. Post Signage at front of Main Entrance 3. Designated Parking area 4. Need to have a local "RP" for the day to day activity.
Will reinspect on 02/12/08 at 8:00am. If Notice is not address to the full, a "Stop Work Order" will be given.
Clint Smith #460 EC Inspector
|
ESC07-01269
| Site Preparation | 2/8/2008 | 2/8/2008 | 2/8/2008 9:40:06 AM | A | PART |
|
|
D.I. maintenance needed on D.I. on N. Ginzel. Recommend slope stabilization at slope to the right of construction entrance. Maintain construction entrance after snow melt.
CAS #460 Erosion Control Inspector
|