Inspections for the day of: Thursday, February 8, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-04364 Rough-In Permanent Service2/8/20182/8/20182/8/2018 3:54:10 PMPCANC
Service change. Phone #: ###-#### Inspection requested via web by John Edwards Service change only, will request inspection for stud bay homeruns are in for supports.
ELE17-04364 Permanent Service2/8/20182/8/20182/8/2018 2:58:37 PMPPASS
Service change. Phone #: ###-#### Inspection requested via web by John Edwards
Meter base to remain and main breaker panel below meter changed for breaker space.
p/s o/h rec ok
ELE17-01400 Electrical Rough-In2/7/20182/8/20182/8/2018 2:43:20 PMPPASS
Contact John Mittleider for in slab rough in level 1 east end. Phone #: ###-#### Inspection requested via web by Tom Betty East and north east level 1 slab pour rough in ok cover.
ELE16-03931 Final2/8/20182/8/20182/8/2018 2:08:27 PMPPART
Unit # 321 and East side corridor
Contact Bob Mott prior to 3:15
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Level 3 321 and east side corridor signed of in office. TCO ok
ELE16-03932 Final2/8/20182/8/20182/8/2018 2:07:28 PMPPART
West side corridor
Electrician on site until 3:15
Contact Bob Mott
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Level 3 west side corridor signed off in office. TCO ok
MIS18-00047 ELE-Conference2/8/20182/8/20182/8/2018 1:20:32 PMPDONE
Caller says in looks as if they are either digging for a day light basement or possibly egress windows. stated there has been truck out front with electrical company name on it as well
Homeowner doing work himself. As of inspection time all work includes changing kitchen flourescents to recessed cans.
6 mini cans being installed with junction boxes in center of each row of 2 cans. These junction boxes shall be accessible as per 300.15(A). Egress window wells being installed
ELE17-02072 Final2/7/20182/8/20182/8/2018 11:54:27 AMAPASS
Please call Brad (###-####) 30 minutes ahead for access Phone #: ###-#### Inspection requested via web by Brad Girard Final ok
ELE18-00413 Electrical Rough-In2/7/20182/8/20182/8/2018 10:52:14 AMAPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Except monitoring and bath rooms wall rough in ok cover
ELE18-00489 Temporary Service2/7/20182/8/20182/8/2018 9:17:29 AMAPASS
Phone #: ###-#### Inspection requested via web by Heath Thomas
t/s u/g n ok
ELE18-00490 Temporary Service2/7/20182/8/20182/8/2018 9:17:06 AMAPASS
Phone #: ###-#### Inspection requested via web by Heath Thomas
t/s u/g n ok
ELE17-01651 Final2/7/20182/8/20182/8/2018 9:03:22 AMAPASS
Install 1 monument sign on N. Cloverdale Rd. ALL PRIMARY POWER BY OTHERS Phone #: ###-#### Inspection requested via web by Ken Olsen
Final ok
ELE17-01651 Electrical Rough-In2/7/20182/8/20182/8/2018 9:02:55 AMAPASS
Install 1 monument sign on N. Cloverdale Rd. ALL PRIMARY POWER BY OTHERS Phone #: ###-#### Inspection requested via web by Ken Olsen
Listing and disconnecting means confirmed. Rough in ok