BLD95-00777
| INSP - Conference | 2/8/1996 | 2/9/1996 | 2/9/1996 12:00:00 AM | A | PASS |
|
|
Walk thru- framing inspection with framer. Jim Sly
|
BLD95-01897
| INSP - Framing/Rough-in | 2/8/1996 | 2/9/1996 | 2/9/1996 12:00:00 AM | A | PASS |
|
|
|
BLD96-00270
| INSP - Framing/Rough-in | 2/9/1996 | 2/9/1996 | 2/9/1996 12:00:00 AM | P | PASS |
|
|
Fire job...all sheetrock removed from 2nd story walls and ceilings, no framing damaged from fire ..OK to cover after electrical inspection. Jim Sly.
|