ELE00-00171
| Final | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | 403 |
|
|
###-#### temp occ
|
ELE00-00250
| Electrical Rough-In | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | 403 |
|
|
###-#### conference kitchen remodel
|
ELE00-00448
| Rough-In Permanent Service | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | 403 |
|
|
Eric; ###-####. Ele r/I perm service
|
ELE99-03385
| Final | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | 403 |
|
|
brad --###-#### for conf insp-- conference street lights grounding.
|
ELE00-00445
| Electrical Rough-In | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | PART |
|
|
conf only\###-#### conference discussed residential code requirements.
|
ELE00-00300
| Electrical Rough-In | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | PART |
|
|
###-#### PVC conduit groundwork.
|
ELE99-03735
| Final | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Pennisular recepticle shall be GFCI controlled. Kitchen hood-fan inoperative. Light outlet box not installed recessed light trims required.
|
ELE99-04457
| Final | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | FAIL |
|
|
###-#### or ###-#### no access left card called contractor and left message.
|
ELE00-00250
| Electrical Rough-In | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | CANC |
|
|
###-#### Done in the am
|
ELE00-00126
| Final | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | FAIL |
|
|
###-#### left card no access contractor will reschedule.
|