BLD00-00018
| BLD-Final | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | PASS |
|
|
###-####--brad --fn
|
BLD00-00213
| BLD-Foundation | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | PART |
|
|
###-#### poured appeals ok
|
BLD00-00265
| BLD-Framing/Rough-in | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | PASS |
|
|
###-#### paul Removed lath plaster replacing with drywall ele has been approved. Suggested to contractor to insulate a 4" section of wall (west).
|
BLD99-03517
| BLD-Conference | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | CANC |
|
|
As early as possible. Scott; ###-#### or ###-####. Unable to do am inspections due to staff training session by ICBO
|
BLD00-00160
| BLD-Framing/Rough-in | 2/8/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | A | PART |
|
|
###-#### fireblocking and electrical approval
|
BLD00-00178
| BLD-Footing | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/09/2000 at 09:12:36. Contact: ###-####.
|
MEC99-03434
| Final | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/09/2000 at 09:24:52. Contact: ###-####. Unable to do this day am training with ICBO
|
BLD99-02817
| BLD-Framing/Rough-in | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | PART |
|
|
###-#### constructing 1 hour wall around book shelf
|
MEC00-00366
| Final | 2/9/2000 | 2/9/2000 | 2/9/2000 12:00:00 AM | P | PASS |
|
|
###-####
|