Inspections for the day of: Wednesday, February 9, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-03549 BLD-Wall cover2/8/20002/9/20002/9/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/08/2000 at 11:02:03. Contact: ###-####.
BLD99-03625 BLD-Framing/Rough-in2/8/20002/9/20002/9/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/08/2000 at 13:18:01. Contact: ###-####.
BLD98-03724 BLD-Framing/Rough-in2/8/20002/9/20002/9/2000 12:00:00 AMAPART
gene ###-#### 2 hour wall incomplete.
BLD00-00043 BLD-Foundation2/8/20002/9/20002/9/2000 12:00:00 AMAFAIL
###-#### poured without inspection no plans or humans on site.
BLD99-03185 BLD-Final2/8/20002/9/20002/9/2000 12:00:00 AMAPASS
key above front door 1-###-#### Tim L/C issued
BLD00-00114 BLD-Foundation2/8/20002/9/20002/9/2000 12:00:00 AMAPASS
###-#### mana
MEC00-00407 Rough-in2/8/20002/9/20002/9/2000 12:00:00 AMPPASS
###-####
BLD99-03100 BLD-Final2/9/20002/9/20002/9/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/09/2000 at 07:40:10. Contact: ###-####. See c/n
BLD99-02399 BLD-Other2/9/20002/9/20002/9/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/09/2000 at 10:40:34. Contact: ###-####. Grout pour
BLD99-03352 BLD-Framing/Rough-in2/8/20002/9/20002/9/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/08/2000 at 15:01:15. Contact: ###-####.
BLD00-00049 BLD-Framing/Rough-in2/8/20002/9/20002/9/2000 12:00:00 AMPFAIL
shear nailing\\###-#### not ready not even close see c/n