BLD00-03716
| BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
###-#### CEILING GRID ceilling ok pending mech and ele approval. 2/9/2001 9:41:53 AM
|
BLD00-01783
| BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | FAIL |
|
|
###-#### nfpa sprinkler under stair required/soffit store front fastner shot pins and # of rfi for approval from engineer. nuts at east stair colum to beam need tighten. 2/9/2001 10:33:34 AM
|
BLD00-01150
| BLD-Final | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | FAIL |
|
|
Darren ###-#### corridor thru protection required / s lables required on door assemblies 2/9/2001 3:02:30 PM
|
BLD00-01726
| BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 17:14:56. Contact: ###-####. called in on wrong permit # 2/12/2001 12:59:09 PM
|
BLD00-02920
| BLD-Wall cover | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 05:46:22. Contact: ###-####. ceilling ok will check on final fo primetor wires/ tennet walls need protection. 2/9/2001 3:26:12 PM
|
BLD00-02980
| BLD-Final | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 2/9/2001 8:55:49 AM final ok for temp / final ok for perm. upon ele and health dept. sign off.
|
BLD00-01862
| BLD-Final | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | FAIL |
|
|
Final, reinspect (I have the card) partions over 6 ft laderal design req. 2/12/2001 9:16:10 AM
|
BLD00-03713
| BLD-Other | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 14:30:36. Contact: ###-####. ceilling ok for cover pending ele,mech. fire wall must be maintained 1 hr . 2/11/2001 9:23:52 PM
|
BLD00-03143
| BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 15:03:15. Contact: ###-####.
|
BLD00-01563
| BLD-Concrete | 2/7/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 06:41:13. Contact: ###-####. placed with special insp. pending report. 2/11/2001 9:21:33 PM
|
BLD00-01976
| BLD-Final | 2/7/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PASS |
|
|
###-#### l/c ok 2/9/2001 11:08:34 AM
|