PLM00-03670
| Roof Drains | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 16:25:52. Contact: ###-####. one 8
one 8", one 4"
' 2/9/2001 11:05:42 AM
|
PLM00-04391
| Plumbing Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 16:47:03. Contact: ###-####.
|
PLM00-03202
| Groundwork | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 18:34:49. Contact: ###-####. 4" waste line thru wall with riser to floor drain in fire riser room. 2/9/2001 11:44:48 AM
|
PLM00-03670
| Roof Drains | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 2/9/2001 11:04:52 AM test on rdi front complete 2/9/2001 4:01:54 PM
|