ELE01-00248
| Final | 2/7/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 12:54:32. Contact: ###-####. hot tub corrections per jray completed. ok. 2/9/2001 9:41:43 AM
|
ELE01-00410
| Temporary Service | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PASS |
|
|
###-####. t/s ug glenn ele #0410
cartwright canyon sub Lot: 18 Block: 1 2/9/2001 10:47:56 AM
|
ELE00-04565
| Electrical Rough-In | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
###-####. exterior soffit recessed lighting r/i. ok. 2/9/2001 8:58:29 AM
|
ELE01-00419
| Electrical Rough-In | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
Jim Williams ###-####. walls ele r/i. ok. 2/9/2001 10:23:35 AM
|
ELE00-04831
| Final | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PASS |
|
|
###-####. completed. 2/9/2001 3:08:40 PM
|
ELE98-03567
| Electrical Rough-In | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PART |
|
|
on the first second and third floor George ###-####. 1st recepticle outlet in column. 2nd & 3rd floor, bathrooms, storeage area. ele r/i. 2/9/2001 2:25:15 PM
|
ELE98-03567
| Final | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 403 On 2/9/2001 2:27:20 PM pharmacy on 4th floor; temporary occupancy(phase 2).
|