MIS00-00237
| BLD-Final | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | FAIL |
|
|
###-####,installer inspection record ok, c/n for handrail and guard rail ,tread noseing,posted. 2/9/2001 12:16:57 PM
|
MIS00-00303
| BLD-Final | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | FAIL |
|
|
###-####new decks/landing constructed,guard rail height,guard rail spacing,handrail reqrise not correct c/n posted. 2/9/2001 12:27:14 PM
|
BLD00-01786
| BLD-Final | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
Jim House ###-####. ok for perm oc pending final from zoning. 2/9/2001 11:59:52 AM
|
BLD00-01874
| BLD-Final | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PASS |
|
|
Lee ###-####
|
BLD00-03631
| BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 11:43:47. Contact: ###-####.Need to have architect reveiw the existing construction and submit any neccessary revisions as the firewall at north of existing rest room is not being cont as plans. south of this is ok. also architect needs to provide a detail for support of the new tall firewall in the shop. went over these items with building tenant/contractor. 2/9/2001 10:56:48 AM
|
BLD01-00113
| BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 13:47:48. Contact: ###-####.c/n to support the soffit construction by other means than the t-bar grid.also obtain ele insp. 2/9/2001 2:57:02 PM
|
BLD01-00026
| BLD-Final | 2/9/2001 | 2/9/2001 | 2/9/2001 12:00:00 AM | P | PASS |
|
|
Jeff ###-####
|