Inspections for the day of: Friday, February 9, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00290 Rough-in2/8/20012/9/20012/9/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/08/2001 at 11:31:51. Contact: ###-####.
MEC01-00290 Pressure Test2/8/20012/9/20012/9/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/08/2001 at 11:32:05. Contact: ###-####.
MEC01-00390 Rough-in2/8/20012/9/20012/9/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/08/2001 at 12:12:33. Contact: ###-####. need manuf specs on job site 2/9/2001 12:31:53 PM
MEC00-03508 Final2/8/20012/9/20012/9/2001 12:00:00 AMANR
###-####
MEC01-00022 Final2/9/20012/9/20012/9/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 02/09/2001 at 07:49:46. Contact: ###-####. done by steve 2/12/2001 10:58:53 AM
MEC01-00186 Rough-in2/9/20012/9/20012/9/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/09/2001 at 08:33:29. Contact: ###-####. CORRECTIONS POSTED 2/9/2001 2:49:53 PM
MEC01-00186 Pressure Test2/9/20012/9/20012/9/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/09/2001 at 08:34:09. Contact: ###-####.
MEC01-00403 Final2/9/20012/9/20012/9/2001 12:00:00 AMPPASS
FN BUTLER ###-####
MEC01-00379 Rough-in2/9/20012/9/20012/9/2001 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 02/09/2001 at 11:14:50. Contact: ###-####.