BLD03-02898
| BLD-Final | 2/5/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 2/5/2004 at 2:54:59 PM. Contact: ###-####. 2/9/2004 10:29:50 AM
|
BLD03-00781
| BLD-Framing/Rough-in | 2/6/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | A | PART |
|
|
Framing inspection south side of C wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman . Ok to insulate 2/9/2004 10:27:21 AM
|
BLD03-02409
| BLD-Final | 2/6/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/6/2004 at 3:16:39 PM. Ok perm oc. 2/9/2004 11:39:57 AM
|
BLD03-01851
| BLD-Framing/Rough-in | 2/6/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/6/2004 at 4:57:51 PM. Contact: ###-####. Roof needs additional nailing ,2 hold downs need installation, 1 is hd 8 needs to be hd 10. Went over areas with contractor will need to recall. 2/9/2004 5:49:57 PM
|
MIS03-00235
| BLD-Final | 2/9/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | PART |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Ok pending Fire/Life Safety approval. 2/9/2004 5:47:57 PM
|
BLD03-02431
| BLD-Conference | 2/9/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | DONE |
|
|
Contractor called me and asked about the final inspection, I told him the same thing as I did on 1/30/03, I went out to site and had no corrections , but he needed to call the fire /life safety inspector out for a final before job would be completely approved. I called called Troy and informed him of inspection also this day and told him to call me when done. 2/9/2004 4:43:34 PM
|