FIR03-00732
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | A | NR |
|
|
Ralph with Alarmco -- has to be between 8:00-10:30 am or 2:30-4:30 pm; Phone #: ###-#### Internet Inspection Request from: Teresa Costello rescheduled for 2/10 per Ralph 2/9/2004 11:31:28 AM
|
BLD03-02969
| FIRE-Final Inspection | 2/9/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/9/2004 at 6:22:52 AM. Contact: ###-####. removing the office wall has overspaced the 15 cd strobe from the wall with the new sink; a 110 cd strobe will be needed where the 15 cd strobe is currently located to meet NFPA 72 Table 7.5.4.1.1 (a) 2/9/2004 8:38:54 AM
|
MIS03-00235
| FIR-Final | 2/9/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | FAIL |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need exit signs repaired; add exit sign on west wall; tape/escuteons on sprinklers; south exit area prevents exiting to public way by locked gate 2/9/2004 4:06:12 PM
|