FIR03-00745
| INSP-Final Inspection | 2/6/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | A | FAIL |
|
|
extinguishing system failed to operate 2/9/2004 10:01:12 AM
|
FIR03-00785
| INSP-Final Inspection | 2/9/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/9/2004 at 7:21:34 AM. Contact: ###-####.
|
BLD03-02991
| FIRE-Final Inspection | 2/9/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | FAIL |
|
|
Provide approved door hardware on the mechanical room door. Plug holes in the hood
|
FIR04-00086
| INSP-Conference | 2/9/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | DONE |
|
|
I stopped by the project at 3:30 today for an inspection on the sprinkler underground and found Matt Casey with future tech installing the fire alarm system. The plans had just been submitted to the city today. I told them to stop work and get approved plans.
|
FIR04-00047
| INSP-Final Inspection | 2/6/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | PASS |
|
|
hood suppresion system operated correctly 2/9/2004 3:34:47 PM
|
FIR03-00780
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/9/2004 | 2/9/2004 12:00:00 AM | P | FAIL |
|
|
Inspection was for the rough-in and cover of the first floor. 1 1/4" tie in's are not done, pendant head overspace in mechanical room, pendant head overspaced understairs in connecting corridor and piping not complete in rooms as marked on approved plans. Outside canopies are ok to cover 2/9/2004 4:21:17 PM
|