Inspections for the day of: Wednesday, February 9, 2005.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00688 FIR-Aging Inspection2/9/20052/9/20052/9/2005 12:00:00 AM NR
Per Dan work is in progress. 2/9/2005 9:21:35 AM
FIR04-00810 INSP-Final Inspection2/9/20052/9/20052/9/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/9/2005 at 7:09:13 AM. Contact: ###-####.
BLD04-03037 FIRE-Final Inspection2/9/20052/9/20052/9/2005 12:00:00 AMAPASS
Fire life safety finaled. Provide additional fire extinguisher before structural final. 2/9/2005 10:02:08 AM
FIR03-00231 INSP-Final Inspection2/3/20052/9/20052/9/2005 12:00:00 AMAPASS
Contact: Jim; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
BLD03-02187 FIRE-Conference2/8/20052/9/20052/9/2005 12:00:00 AMADONE
I spoke to contractor about life safety issues such as emergency light and exit sign placement. It doesn't appear exit signs will be required on ground floor of east empty tenant 2/9/2005 10:00:54 AM
MIS05-00019 FIR-Final2/8/20052/9/20052/9/2005 12:00:00 AMPPART
A temporary occupancy was given until the exit sign at the rear door is repaired and approved hardware is installed on the rear door. 2/9/2005 1:53:21 PM
FIR04-00666 INSP-Sprinkler Rough-in/Hydro2/9/20052/9/20052/9/2005 12:00:00 AMPFAIL
There are still acouple of areas that need better tenting. Brian will fix and call in inspection 2/9/2005 4:06:30 PM
FIR05-00053 INSP-Final Inspection2/9/20052/9/20052/9/2005 12:00:00 AMPPART
Can't give final until all missing canopies are installed and ceiling tile around head done. Rough-in is ok and piping can be covered. Additional four pendants in elevator lobby not required. 2/9/2005 11:48:15 AM
BLD04-01735 FIRE-Final Inspection2/9/20052/9/20052/9/2005 12:00:00 AMPPASS
Fire life safety finaled 2/9/2005 12:22:32 PM
FIR05-00031 INSP-Sprinkler Rough-in/Hydro2/9/20052/9/20052/9/2005 12:00:00 AMPPART
Hydro test for the west system passed. Still need annual certification for the anti-freeze system. 2/9/2005 3:42:10 PM