PLM05-00351
| Sprinkler (Final) | 2/8/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | A | PASS |
|
|
george ###-####
|
PLM05-00352
| Sprinkler (Final) | 2/8/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | A | PASS |
|
|
george ###-####
|
PLM03-00660
| Final | 2/8/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | A | PASS |
|
|
kenny ###-####
|
PLM05-00096
| Plumbing Rough-in | 2/8/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 12:04:53 PM. Contact: ###-####. rain drains outside bldg, test okay 2/8/2005 1:26:54 PM
|
PLM05-00201
| Water and/or Sewer | 2/8/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | A | PASS |
|
|
von; Phone #: ###-#### Internet Inspection Request from: Barbara Moore vacuum breakers installed, sewer lines tested with mains witnessed by mike with public works 2/9/2005 10:19:27 AM
|
PLM05-00354
| Plumbing Rough-in | 2/9/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 6:58:12 AM. Contact: ###-####. ground work and roughin 2/9/2005 9:50:50 AM
|
PLM05-00359
| Plumbing Rough-in | 2/9/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | P | PASS |
|
|
###-#### - ken
|
PLM05-00120
| Final | 2/9/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | P | PASS |
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore per phone conversation with bob jue with central district health the inlet of the little dipper may be directly connected to unit as long as the outlet is indirected to a floor sink with an air gap. 2/9/2005 1:56:46 PM 2/9/2005 1:59:11 PM
|
PLM04-03841
| Final | 2/8/2005 | 2/9/2005 | 2/9/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 2:09:47 PM. Contact: ###-####.
|