BLD03-01529
| BLD-Aging Inspection | 2/9/2006 | 2/9/2006 | 2/13/2006 4:39:49 PM | | PASS |
|
|
|
BLD04-02503
| BLD-Aging Inspection | 2/9/2006 | 2/9/2006 | 2/13/2006 4:39:01 PM | | PASS |
|
|
|
BLD05-01950
| BLD-Framing/Rough-in | 2/8/2006 | 2/9/2006 | 2/10/2006 1:59:56 PM | A | PART |
|
|
Joshua -- for sheeting/shearing; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong exterior ok to cover w/ house wrap,, nailing is ok,, straps are being reviewed for proper method on how engineer has designed
|
BLD05-03467
| BLD-Footing | 2/9/2006 | 2/9/2006 | 2/9/2006 4:44:26 PM | P | PART |
|
|
Santos -- would like insp at 2:30 pm -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong footing is w i p,, BUT the owner may change her mind on design or ???,, may hold off on pour,,, ok to pour today if no changes occur
|
BLD04-02348
| BLD-Wall cover | 2/8/2006 | 2/9/2006 | 2/9/2006 4:34:16 PM | P | PART |
|
|
Call Ray @ ###-####; Phone #: ###-#### Internet Inspection Request from: Bob Thornton 7th floor,, fire caulk ok around drains at floor line ok,, most insulation is in wall areas
|
BLD05-02972
| BLD-Framing/Rough-in | 2/8/2006 | 2/9/2006 | 2/9/2006 3:39:42 PM | P | PASS |
|
|
Mark -- call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to insulate and cover garage
|
BLD05-03372
| BLD-Footing | 2/8/2006 | 2/9/2006 | 2/9/2006 3:39:00 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/8/2006 at 12:41:40 PM. Contact: ###-####.
|
BLD04-02430
| BLD-Aging Inspection | 2/9/2006 | 2/9/2006 | 2/9/2006 2:55:49 PM | | DONE |
|
|
|
BLD05-02921
| BLD-Energy code compliance | 2/8/2006 | 2/9/2006 | 2/9/2006 2:07:58 PM | A | PASS |
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02190
| BLD-Final | 2/8/2006 | 2/9/2006 | 2/9/2006 1:57:54 PM | A | PASS |
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02625
| BLD-Energy code compliance | 2/8/2006 | 2/9/2006 | 2/9/2006 1:34:10 PM | A | PASS |
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD05-01419
| BLD-Final | 2/7/2006 | 2/9/2006 | 2/9/2006 1:32:08 PM | A | PASS |
|
|
call for access code//pat reed; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-03437
| BLD-Conference | 2/8/2006 | 2/9/2006 | 2/9/2006 11:44:17 AM | A | PART |
|
|
steve morris; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa conf, on f/w design vs. field
|
BLD05-01502
| BLD-Final | 2/8/2006 | 2/9/2006 | 2/9/2006 11:23:23 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/8/2006 at 3:54:57 PM. Contact: ###-####.
|
BLD05-01502
| DOC - Permit Finaled | 2/9/2006 | 2/9/2006 | 2/9/2006 12:00:00 AM | P | PASS |
|
|
c of o issued
|
BLD05-01419
| DOC - Permit Finaled | 2/9/2006 | 2/9/2006 | 2/9/2006 12:00:00 AM | P | PASS |
|
|
c of o issued
|
BLD05-02190
| DOC - Permit Finaled | 2/9/2006 | 2/9/2006 | 2/9/2006 12:00:00 AM | P | PASS |
|
|
c of o issued
|
BLD04-02430
| DOC - Permit Finaled | 2/9/2006 | 2/9/2006 | 2/9/2006 12:00:00 AM | P | PASS |
|
|
done
|