Inspections for the day of: Thursday, February 9, 2006.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03329 BLD-Footing2/8/20062/9/20062/9/2006 5:12:01 PMPNR
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-03011 BLD-Footing2/8/20062/9/20062/9/2006 5:11:49 PMPNR
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-03317 BLD-Footing2/8/20062/9/20062/9/2006 5:11:39 PMPNR
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-02394 BLD-Footing2/9/20062/9/20062/9/2006 2:49:16 PMPPASS
Tom -- for slab; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD05-02919 BLD-Wall cover2/8/20062/9/20062/9/2006 2:10:44 PMPPASS
this is a request for a insulation inspection after 12 p.m.thanks Internet Inspection Request from: larry hobbs. All framing issues have been repaired. ok to cover.
BLD05-03330 BLD-Footing2/8/20062/9/20062/9/2006 1:38:48 PMPNR
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Footings not excavated.
BLD06-00083 BLD-Footing2/8/20062/9/20062/9/2006 11:06:50 AMACANC
please call 1 hour prior so can meet you//stan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-01861 BLD-Footing2/8/20062/9/20062/9/2006 10:42:23 AMAPASS
Scheduled by a contractor via Hello! on 2/8/2006 at 12:29:15 PM. Contact: ###-####. perimeter footings and footing for masonry seperation wall.
BLD05-01132 BLD-Energy code compliance2/8/20062/9/20062/9/2006 10:13:09 AMAPASS
Ned; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-01972 BLD-Framing/Rough-in2/8/20062/9/20062/9/2006 10:04:46 AMAFAIL
Scheduled by a contractor via Hello! on 2/8/2006 at 5:21:24 PM. Contact: ###-####. Need approved plans and truss engineering on repaired trusses?
BLD05-03298 BLD-Footing2/8/20062/9/20062/9/2006 9:42:35 AMAPART
vern; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Interior column pad footings for second floor addition.
BLD05-02952 BLD-Final2/8/20062/9/20062/9/2006 8:46:31 AMAPASS
DONNY; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-02783 BLD-Energy code compliance2/8/20062/9/20062/9/2006 8:35:09 AMAPASS
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa