MEC06-03981
| Final | 2/9/2007 | 2/9/2007 | 2/9/2007 4:44:19 PM | P | PASS |
|
|
Please inspect as late afternoon. Call with any problems. Thanks, April. Phone #: ###-####
|
MEC06-04248
| Final | 2/9/2007 | 2/9/2007 | 2/9/2007 4:33:02 PM | P | PASS |
|
|
code is 8834 looks like a dlb permit.
|
MEC06-02985
| Final | 2/8/2007 | 2/9/2007 | 2/9/2007 4:13:53 PM | P | PASS |
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PLM06-01892
| Storm Drains | 2/8/2007 | 2/9/2007 | 2/9/2007 3:56:31 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/8/2007 at 3:21:26 PM. Contact: ###-####. 3 west sections of storm drain test ok
|
MEC07-00254
| Rough-in | 2/9/2007 | 2/9/2007 | 2/9/2007 3:17:03 PM | P | PASS |
|
|
jaimie; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
MEC06-03968
| Final | 2/8/2007 | 2/9/2007 | 2/9/2007 2:57:51 PM | P | PART |
|
|
rough Phone #: ###-####ok to install tile except room 120
|
MEC06-03741
| Final | 2/9/2007 | 2/9/2007 | 2/9/2007 1:24:05 PM | P | PASS |
|
|
|
MEC07-00466
| Rough-in | 2/8/2007 | 2/9/2007 | 2/9/2007 11:58:38 AM | A | FAIL |
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall30" min sevice platform infront of furnace, install walkway, 1" min. clearance to b-vent of fireplace. 20# test ok
|
MEC07-00466
| Pressure Test | 2/8/2007 | 2/9/2007 | 2/9/2007 11:56:16 AM | A | PASS |
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 20# test ok
|
MEC06-04181
| Final | 2/9/2007 | 2/9/2007 | 2/9/2007 10:25:56 AM | A | PASS |
|
|
|
PLM06-03536
| Final | 2/7/2007 | 2/9/2007 | 2/9/2007 8:41:03 AM | A | PASS |
|
|
Pat ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MEC06-03912
| Final | 2/8/2007 | 2/9/2007 | 2/9/2007 8:40:35 AM | A | PASS |
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|