ESC08-00617
| BMP Violation | 2/9/2009 | 2/9/2009 | 2/9/2009 4:10:49 PM | P | FAIL |
|
|
met rp on site, tracking control and dirt off hard surfaces, install sediment control to stock piles adjacent sidewalk, clean DI's RP is currently completing c/n left on site
|
ESC08-00617
| Conference | 2/6/2009 | 2/9/2009 | 2/9/2009 4:06:17 PM | A | DONE |
|
|
met eric on site to discuss esc requirements
|
ESC08-00999
| BMP Violation | 2/6/2009 | 2/9/2009 | 2/9/2009 4:04:40 PM | A | FAIL |
|
|
tracking control and remove dirt from hard surfaces, site cleanup trash, informed rp verbally and posted c/n
|
MEC09-00148
| Rough-in | 2/9/2009 | 2/9/2009 | 2/9/2009 4:01:44 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/9/2009 at 11:14:34 AM. Contact: ###-####. ok to cover hard lids
|
MEC09-00244
| Final | 2/9/2009 | 2/9/2009 | 2/9/2009 4:01:01 PM | P | CANC |
|
|
renae Phone #: ###-####
|
MEC09-00244
| Rough-in | 2/9/2009 | 2/9/2009 | 2/9/2009 4:00:48 PM | P | PASS |
|
|
renae Phone #: ###-####
|
MEC09-00240
| Pressure Test | 2/6/2009 | 2/9/2009 | 2/9/2009 4:00:13 PM | P | CANC |
|
|
aaron Note: late afternoon Phone #: ###-####
|
MEC09-00217
| Pressure Test | 2/4/2009 | 2/9/2009 | 2/9/2009 3:59:49 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: David Cole 20# test
|
MEC09-00240
| Rough-in | 2/6/2009 | 2/9/2009 | 2/9/2009 3:57:52 PM | A | PASS |
|
|
aaron Note: late afternoon Phone #: ###-####
|
MEC09-00240
| Pressure Test | 2/9/2009 | 2/9/2009 | 2/9/2009 3:57:33 PM | A | PASS |
|
|
aaron Note: late afternoon Phone #: ###-#### 20# test
|