Inspections for the day of: Tuesday, February 9, 2010.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00287 FIRE-Conference2/9/20102/9/20102/9/2010 4:35:20 PMADONE
Completed on site review of city set plans and notes with contractor. Noted incorrect door hardware at the main entry/exit, five restrooms and the changing room. Missing one PFE at the second level, need to post fire access lane marking per sheet C1.1, post signage at the door to the FACP room, discussed exit signs, trade permit finals and two project related BLD permits.
FIR09-00354 INSP-Final Inspection2/9/20102/9/20102/9/2010 4:21:54 PMPPASS
Corrections per previous inspection repaired. Fire alarm testing passed, permit finaled.
FIR09-00409 INSP-Final Inspection2/9/20102/9/20102/9/2010 4:21:06 PMPPASS
Corrections finished, site testing passed, fire alarm permit final okayed. Noted 120V outside bell at the fire sprinkler riser did not operate during the waterflow test.
BLD10-00078 FIRE-Final Inspection2/9/20102/9/20102/9/2010 4:17:50 PMPFAIL
Correction items include door hardware at four locations ( two main entry/exits-STE 301 and 302, office in 301, and backward panic in hallway at 302), provide missing escutcheons for fire sprinkler heads at various locations, post suite address at 302, need stamped plans and notes on site at next visit, two sprinkler heads are overspaced off the new partition wall.
FIR09-00608 INSP-Final Inspection2/9/20102/9/20102/9/2010 4:11:38 PMPPART
Correction notice items verified for completion, remainder of alarm work passed site testing. Final pending offsite monitoring check via permit FIR09-00740. Contractor to provide missing signage at the door to the FACP room.
FIR10-00037 INSP-Final Inspection2/8/20102/9/20102/9/2010 4:07:21 PMAPASS
Scope of fire sprinkler permit work completed satisfactory. Noted new flow switch has been installed, however is not yet wired due to pending alarm permit for this aspect of the project.