ESC09-00470
| General Inspection | 2/4/2010 | 2/9/2010 | 2/9/2010 3:00:57 PM | A | PASS |
|
|
Conference not general; Reminder to RP, (J. Walker) that time is close for hydroseeding bare ground outside the vertical building structure area. As weather conditions are sure to commence stabilization activities.
|