BLD10-00173
| FIRE-Final Inspection | 2/8/2010 | 2/9/2010 | 2/10/2010 7:15:05 AM | P | CANC |
|
|
Cancelled due to time constraints but I spok to Lori at ###-#### on the phone and discussed getting the existing fire extinguisher tagged and providing the missing sticker over the main door. Inspection has been rescheduled for wednesday.
|
FIR09-00581
| INSP-Supply line flush | 2/8/2010 | 2/9/2010 | 2/10/2010 7:13:24 AM | P | PASS |
|
|
The underground supply line flush passed.
|
FIR09-00708
| INSP-Sprinkler Rough-in | 2/8/2010 | 2/9/2010 | 2/10/2010 7:12:53 AM | P | PASS |
|
|
The rough-in inspection for system 4 attic piping passed. Three baffles need installed as discussed. The 24 hour air test for system 4 was started at 2:00 with 52psi on the guage.
|
FIR09-00535
| INSP-Final Inspection | 1/29/2010 | 2/9/2010 | 2/9/2010 3:18:19 PM | P | FAIL |
|
|
Provide corrosion protection for the exterior sprinkler piping, provide ventilation per the review comments and nfpa 20, provide a floor drain per the review comments and nfpa 20, remove the old sprinkler piping, verify the nozzles are not plugged, provide complete testing for the entire scope of work (such as fire pump cert.), provide correct tamper switches (automatic resetting).
|
FIR09-00673
| INSP-Final Inspection | 2/9/2010 | 2/9/2010 | 2/9/2010 3:12:48 PM | P | FAIL |
|
|
The fire alarm permit could not be completed due to the project related fire sprinkler permit not being able to be completed. Pump running, phase reversal and loss of power have been verified. Rick replaced a module in the fire alarm panel while I was on site.
|
FIR09-00707
| INSP-Sprinkler Rough-in | 2/8/2010 | 2/9/2010 | 2/9/2010 3:04:49 PM | A | PASS |
|
|
See the city approved plans for locations where the sprinkler piping can be covered.
|
FIR09-00568
| INSP-Final Inspection | 2/8/2010 | 2/9/2010 | 2/9/2010 10:50:06 AM | P | PASS |
|
|
Permit finaled. The NetCon was a 5.
|
FIR09-00567
| INSP-Final Inspection | 2/8/2010 | 2/9/2010 | 2/9/2010 10:49:13 AM | P | PASS |
|
|
Permit finaled. The NetCon was a 5.
|
BLD09-00969
| FIRE-Final Inspection | 2/9/2010 | 2/9/2010 | 2/9/2010 10:46:51 AM | P | PASS |
|
|
life safety passed
|
BLD09-01564
| FIRE-Final Inspection | 2/8/2010 | 2/9/2010 | 2/9/2010 9:38:09 AM | A | PASS |
|
|
Life safety passed. The builder will provide the correct sticker at the main exit prior to the building inspection.
|
FIR09-00731
| INSP-Supply line flush | 2/8/2010 | 2/9/2010 | 2/9/2010 8:14:41 AM | A | FAIL |
|
|
The underground flush was not performed. Roy said they were not ready to go since he was missing the key.
|
FIR10-00046
| INSP-Final Inspection | 2/8/2010 | 2/9/2010 | 2/8/2010 11:03:31 AM | A | CANC |
|
|
Tom Wahl Phone #: ###-#### Internet Inspection Request from: joe fink Inspection cancelled from web by: joe fink
|