BLD10-02371
| FIRE-Conference | 2/9/2011 | 2/9/2011 | 2/9/2011 5:15:01 PM | P | DONE |
|
|
Conversation with contractor regarding items needed for occupancy approvals including project related trade permits.
|
FIR11-00006
| INSP-Sprinkler Rough-in/Hydro | 2/9/2011 | 2/9/2011 | 2/9/2011 5:13:25 PM | P | PASS |
|
|
Overhead rough-in passed
|
FIR10-00183
| INSP-Final Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 12:55:49 PM | P | PASS |
|
|
Underground fire supply line permit finaled.
|
FIR11-00006
| INSP-Final Inspection | 2/8/2011 | 2/9/2011 | 2/9/2011 12:50:53 PM | A | PASS |
|
|
Fire sprinkler permit work passed both rough-in and final inspections. Noted overspaced coverage outside the remodel area on an adjacent branchline to the north wall-.
|
BLD10-02905
| FIRE-Sprinkler Rough-in | 2/8/2011 | 2/9/2011 | 2/9/2011 12:47:31 PM | A | PART |
|
|
Overhead fire sprinkler system modifications okayed for cover with exceptions as marked on FP plan sheet. Verified insulation fill at the east soffit concealed space.
|
FIR08-00825
| FIR-Aging Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 12:19:30 PM | | NR |
|
|
Incomplete
|
FIR09-00307
| FIR-Aging Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 12:03:00 PM | | PART |
|
|
|
FIR10-00183
| FIR-Aging Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 10:53:21 AM | | DONE |
|
|
Scope of permit work is finished.
|
FIR10-00560
| FIR-Aging Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 10:50:53 AM | | DONE |
|
|
Final inspection scheduled 2/10.
|