BLD12-00096
| BLD-Framing/Rough-in | 2/9/2012 | 2/9/2012 | 2/9/2012 3:00:46 PM | P | CANC |
|
|
todd Phone #: ###-####
|
BLD12-00096
| BLD-Wall Bracing | 2/9/2012 | 2/9/2012 | 2/9/2012 3:00:39 PM | P | PART |
|
|
todd Phone #: ###-####. Exterior shear nailing ok. All issues were repaired while on site. Ok to cover exterior only. Needs to provide straps at portal frame in garage and provide portal frame at bedroom.
|
ESC12-00034
| Random Inspection | 2/9/2012 | 2/9/2012 | 2/9/2012 2:58:32 PM | P | PASS |
|
|
|
BLD11-02987
| BLD-Other | 2/8/2012 | 2/9/2012 | 2/9/2012 1:55:20 PM | P | PASS |
|
|
Ceiling grid.
|
BLD10-02069
| BLD-Conference | 2/2/2012 | 2/9/2012 | 2/9/2012 11:46:40 AM | A | PASS |
|
|
Interior steel stud framed walls and hardlids for area C. Also walk through mech. room and reviewed special inspection reports.
|
BLD12-00106
| BLD-Final | 2/8/2012 | 2/9/2012 | 2/9/2012 9:39:49 AM | A | PASS |
|
|
Christopher Phone #: ###-####
|
BLD12-00106
| DOC - Permit Finaled | 2/9/2012 | 2/9/2012 | 2/9/2012 9:39:40 AM | P | PASS |
|
|
|