FIR14-00783
| INSP-Sprinkler Rough-in | 2/9/2015 | 2/9/2015 | 2/9/2015 5:15:51 PM | P | PART |
|
|
Inspection for hangers only at z-purlins prior to cover.
|
FIR14-00805
| INSP-Final Inspection | 2/6/2015 | 2/9/2015 | 2/9/2015 3:48:42 PM | P | PASS |
|
|
Hood suppression system operated correctly under test conditions. Inspection passed. Permit finaled.
|
BLD15-00133
| FIRE-Final Inspection | 2/9/2015 | 2/9/2015 | 2/9/2015 3:46:52 PM | P | PASS |
|
|
Verified previous correction notice item for completion. Fire life safety passed.
|
FIR14-00708
| INSP-Sprinkler Rough-in | 2/9/2015 | 2/9/2015 | 2/9/2015 3:45:59 PM | P | PART |
|
|
Rough-in inspection completed for building area F 3rd floor wet system living units only- Main at corridor is not yet installed. As-built drawings verified on site to match installation. Items noted corrected while on site.
|
FIR14-00531
| INSP-Sprinkler Rough-in | 2/9/2015 | 2/9/2015 | 2/9/2015 1:34:20 PM | A | PART |
|
|
Verified added coverage at the 3rd and 4th floor tower two riser room concealed spaces.
|
FIR14-00680
| INSP-Final Inspection | 2/4/2015 | 2/9/2015 | 2/9/2015 11:09:15 AM | A | PASS |
|
|
Scope of fire alarm work completed satisfactory. Functional testing passed. Permit finaled.
|