Inspections for the day of: Monday, February 9, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-03533 FIRE-Sprinkler Rough-in2/9/20152/9/20152/9/2015 3:42:33 PMPCANC
wrong permit called in.
FIR14-00933 INSP-Final Inspection2/9/20152/9/20152/9/2015 3:24:09 PMPFAIL
All items tested ok except a tamper switch is sending a trouble signal to central station instead of a supervisory
BLD14-01590 FIRE-Final Inspection2/9/20152/9/20152/9/2015 3:23:21 PMPFAIL
Life safety will be ok to pass when the project related fire alarm permit is finaled
FIR14-00574 INSP-Sprinkler Rough-in/Hydro2/9/20152/9/20152/9/2015 3:22:41 PMPPASS
Overhead hydro tests passed
FIR14-00896 INSP-Sprinkler Rough-in2/9/20152/9/20152/9/2015 2:41:11 PMPPASS
Too close uprights have modified.
BLD14-01680 FIRE-Final Inspection2/7/20152/9/20152/9/2015 2:35:17 PMACANC
Wrong permit scheduled
BLD14-02980 FIRE-Final Inspection2/6/20152/9/20152/9/2015 2:13:21 PMAFAIL
Gary is not ready for final yet. He will reschedule.
FIR14-00574 INSP-Final Inspection2/9/20152/9/20152/9/2015 2:04:50 PMPPASS
Permit finaled
BLD13-01820 FIRE-Final Inspection2/9/20152/9/20152/9/2015 12:57:08 PMPPASS
Life safety passed. Roadway surface has been approved.
FIR14-00934 INSP-Sprinkler Rough-in2/9/20152/9/20152/9/2015 12:56:17 PMPPASS
Rough-in passed. Piping can be covered.
BLD14-01591 FIRE-Final Inspection2/6/20152/9/20152/9/2015 9:32:23 AMAPASS
life safety passed