Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00524 General Inspection2/9/20152/9/20152/9/2015 4:53:14 PM PEND
Corrections:

1. Need to reseed some areas on the upper side of Paso Fino.
2. Need to have builders or grounds crew pick up litter and materials that have blown off sites.
3. Need to check all DI bags and stormdrains for dirt/sediment accumulation. Found about half of the bags on inlets are full of dirt.

Email developer; will work with individual builders to make corrections as well.

Hackberry Ranch is mostly stable, just need to do some BMP maintenance and make sure the storm drainage system does not get clogged up with sedment.


ESC14-01199 BMP Violation2/9/20152/9/20152/9/2015 3:47:22 PMPPEND
Tim Behrman ###-####

Concrete washout pit provided as requested.

Need to clean up sites on Ardyce for mud clods and loose sediment. Will make another request and escalate if no corrective actions are taken.
ESC14-01129 BMP Violation2/9/20152/9/20152/9/2015 3:41:40 PMPFAIL
No site cleanup or sweeping performed.

2nd notice to make corrections. Will re-inspect later in week. CBH did dig a concrete washout pit as requested.
ESC14-01002 Random Inspection2/9/20152/9/20152/9/2015 2:51:44 PMPPASS
Site is in good condition. Permit posted. BMPs include sediment capture in gutter at edge of property line and vehicle tracking pad. Street and gutter clean, rear hillside vegetation preserved. Approved.
ESC14-00266 General Inspection2/9/20152/9/20152/9/2015 2:20:33 PM PEND
WIP. Near completion. Not yet landscaped/stabilized; perimeter sediment controls are installed.

Builder will need to assist Hackberry Ranch developer with downstream inlet filter bag maintenance when getting finaled out.
ESC13-00684 General Inspection2/9/20152/9/20152/9/2015 1:19:35 PM PASS
WIP on SFHs in Antelope Springs. DI bags are in good conditions, open/unoccupied parcels with mud and puddles have restricted access. No trackout to Parsnip Peak or Warm Springs. Site perimeter is containing sediment and no issues with drainage system.
ESC14-00936 DOC - Permit Finaled2/9/20152/9/20152/9/2015 12:28:42 PMPPASS
Building has been demolished and site has been cleaned with all construction debris removed. The site has been graded flat and is a pit run/sandy river material. No vegetation requested due to site being location of further park construction activities in near feature

Currently the area has restricted vehicle access with large boulders and locked gate, but the porta-pot service truck (river park portapots - not construction related) has made the road muddy and also crosses the Greenbelt path to access a restroom.
ESC14-00936 General Inspection2/6/20152/9/20152/9/2015 11:55:19 AMAPASS
ESC13-01004 Aging Inspection2/9/20152/9/20152/9/2015 11:32:10 AM PASS
Frame is up, house has been stuccoed. Not yet landscaped or stabilized and interior work remaining. No trackout or stormwater pollution observed at site.
ESC14-01046 Site Preparation2/9/20152/9/20152/9/2015 11:23:24 AMPPASS
Clint Phone #: ###-####


Permit is posted with contact details. BMPs provided include inlet protection, trash containment, lined concrete washout for East Valley, and administrative controls to prevent trackout and unauthorized driving on mud.
ESC14-00206 General Inspection2/9/20152/9/20152/9/2015 11:01:27 AM PASS
Sunnyridge phase is currently shut down for winter. No offsite discharges, sediment runoff, or trackout observed.

No immediate corrective actions needed at this time, but once site dries out and work resumes perimeter BMPs, construction entrance(s), and DI bags along Snowbird should be maintained.
ESC14-00282 General Inspection2/9/20152/9/20152/9/2015 10:33:54 AM PASS
Warehouse construction is complete. No activity at site. Still need to complete landscaping, stabilization and remove the temporary BMPs (DI filter bags).

No sediment runoff or trackout at site. No corrections needed at this time. Will check back for landscaping etc.
ESC14-00200 General Inspection2/9/20152/9/20152/9/2015 9:53:30 AM PASS
Construction on Involta Data Center is complete. All parking lots, drainage and other untilities have been installed and cleaned of loose sediment and construction materials.

Temp Occupancy issued for bond on the native grass seeding that will occur. ESC permit will stay open to monitor revegetation which will begin as conditions allow. No corrections needed.
ESC13-00447 Aging Inspection2/9/20152/9/20152/9/2015 8:53:48 AM PASS
Garage addition project near completion. Homeowner RP/GC extended BLD permit in Nov. 2014. No corrections needed.