ELE15-03539
| Electrical Rough-In | 2/8/2016 | 2/9/2016 | 2/9/2016 3:30:31 PM | P | PASS |
|
|
ceiling inspection Phone #: ###-#### Inspection requested via web by Celinda Winters r/i molecular lab ceilings 100%
|
ELE15-03937
| Final | 2/8/2016 | 2/9/2016 | 2/9/2016 3:13:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender final ok
|
ELE15-03952
| Electrical Rough-In | 2/9/2016 | 2/9/2016 | 2/9/2016 2:28:15 PM | P | PASS |
|
|
Uffer inspections. Dave Johnson is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen r/i ok
|
ELE15-02641
| Conference | 2/9/2016 | 2/9/2016 | 2/9/2016 1:59:53 PM | P | DONE |
|
|
Requesting conference with Darrel prior to rough in inspection. Please call Ryan at ###-#### 30 min in advance as GC would like to be included in meeting. Thank you Phone #: ###-#### Inspection requested via web by Kerri Hamilton look at tyvek on 4th and 5th floors installed on floors by GC to keep 3rd floor dry so NM cable can be started. Informed GC and EEG to monitor weather and incoming water during installation. GC said they will keep crew on hand to keep dry. GC says roof should be completed first week of March. GC says they will cover cost to remove and replace nm cable if wet.
|
ELE15-02641
| Electrical Rough-In | 2/8/2016 | 2/9/2016 | 2/9/2016 1:53:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i walls and hard lids on 1st and 2nd floors see e sheets in GC's office
|
ELE15-04089
| Electrical Rough-In | 2/8/2016 | 2/9/2016 | 2/9/2016 11:35:57 AM | P | PASS |
|
|
Ground work inspection. Contact Craig Timmons Phone #: ###-#### Inspection requested via web by Cathy Duchek r/i ok underslab conduits grid line 1 thru 3 ok
|
ELE16-00270
| Final | 2/8/2016 | 2/9/2016 | 2/9/2016 10:49:33 AM | A | PASS |
|
|
Contact: Rob Lawrence Phone #: ###-#### Inspection requested via web by Deb Gooden final ok
|
ELE16-00270
| Electrical Rough-In | 2/9/2016 | 2/9/2016 | 2/9/2016 10:48:53 AM | P | PASS |
|
|
Contact: Rob Lawrence Phone #: ###-#### Inspection requested via web by Deb Gooden r/i ok 2 20amp circuits to tub
|
ELE16-00102
| Final | 2/8/2016 | 2/9/2016 | 2/9/2016 10:20:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn final ok
|
ELE16-00232
| Final | 2/8/2016 | 2/9/2016 | 2/9/2016 9:52:09 AM | A | PASS |
|
|
Please call Jesse and he will meet you onsite to walk you through the system. ###-#### Phone #: ###-#### Inspection requested via web by Matthew Dunay final ok
|
ELE16-00232
| Electrical Rough-In | 2/9/2016 | 2/9/2016 | 2/9/2016 9:42:57 AM | P | PASS |
|
|
Please call Jesse and he will meet you onsite to walk you through the system. ###-#### Phone #: ###-#### Inspection requested via web by Matthew Dunay r/i ok 2 separate systems 2 separate buildings
|
ELE15-02641
| Conference | 2/8/2016 | 2/9/2016 | 2/9/2016 9:24:45 AM | P | CANC |
|
|
Need meeting with Darrel prior to Rough-In inspection Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
ELE16-00265
| Conference | 2/2/2016 | 2/9/2016 | 2/9/2016 8:31:15 AM | A | DONE |
|
|
7:45 am morning conference on-site please contact is Tony ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate discuss fire pump wiring. Asked if Tony would run separate conduit from xformer straight to fire pump controller instead of in and out of main switchboard to satisfy 695.3(A)(1) for the ideal installation if possible. Single line method shown is ok if not possible due to number of conduits fitting in xformer window or sw. gear.
|