Inspections for the day of: Tuesday, February 9, 2016.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02096 ELE-Aging Inspection2/9/20162/9/20162/9/2016 2:46:50 PM DONE
Talk with brad and will look into getting it finaled
GCE15-00150 GCE-Final2/9/20162/9/20162/9/2016 2:43:01 PMPPASS
Darren ###-#### corrections fixed final ok
GCE15-00155 GCE-Final2/9/20162/9/20162/9/2016 2:42:19 PMPPASS
Darren ###-#### corrections fixed final ok
ELE15-03955 Final2/9/20162/9/20162/9/2016 1:55:28 PMPPASS
Someone should be there . Call if not Phone #: ###-#### Inspection requested via web by Brian Hughes master bed final ok
ELE15-03639 Rough-In Permanent Service2/9/20162/9/20162/9/2016 1:41:06 PMPPASS
rough-in ok cover p/s u/g n ok
ELE16-00389 Electrical Rough-In2/9/20162/9/20162/9/2016 1:25:49 PMPPASS
Phone #: ###-#### Inspection requested via web by Brad Girard kitchen remodel ok cover
ELE15-03371 Final2/8/20162/9/20162/9/2016 1:24:47 PMPFAIL
Phone #: ###-#### Inspection requested via web by Brandon Hillman 210.52 receptalces in a pantry with finished counter top shall have GFCI protection 110.7 trim receptacle in make vanity in bath 408.4 field indentification required(label arc fault breakers) 352.30 riser shall be supported 250.94 intersystem bond required
ELE16-00266 Rough-In Permanent Service2/9/20162/9/20162/9/2016 12:57:09 PMPPASS
rough-in ok p/s u/g n ok