MIS13-00078
| MIS-Aging Inspection | 2/9/2016 | 2/9/2016 | 2/10/2016 3:21:11 PM | | PEND |
|
|
|
MIS15-00280
| MIS-Aging Inspection | 2/9/2016 | 2/9/2016 | 2/10/2016 3:20:21 PM | | DONE |
|
|
|
BLD15-03007
| BLD-Aging Inspection | 2/9/2016 | 2/9/2016 | 2/10/2016 3:19:31 PM | | PASS |
|
|
|
BLD15-04356
| BLD-Other | 2/9/2016 | 2/9/2016 | 2/9/2016 5:22:36 PM | P | DEFR |
|
|
Need a ESC site pre-construction inspection. Phone #: ###-#### Inspection requested via web by SHANE JAYO,, defr to esc
|
BLD15-02843
| BLD-Framing/Rough-in | 2/9/2016 | 2/9/2016 | 2/9/2016 5:21:46 PM | P | PEND |
|
|
Steve Phone #: ###-####,, needs a conf on site,, possible wui issues?
|
BLD15-03709
| BLD-Framing/Rough-in | 2/9/2016 | 2/9/2016 | 2/9/2016 5:20:19 PM | P | PART |
|
|
Todd Phone #: ###-####
|
BLD15-04403
| BLD-Wall cover | 2/8/2016 | 2/9/2016 | 2/9/2016 5:15:04 PM | A | PASS |
|
|
Luna Phone #: ###-####
|
BLD15-04510
| BLD-Foundation | 2/9/2016 | 2/9/2016 | 2/9/2016 4:51:14 PM | P | PART |
|
|
Kent-rebar-pour @ 2:00 Phone #: ###-####,, S. I. on site
|
BLD15-01390
| BLD-Conference | 2/8/2016 | 2/9/2016 | 2/9/2016 3:43:59 PM | P | PEND |
|
|
Dave Phone #: ###-####,, ?s on spiral stairs,, need to research
|
BLD15-03600
| BLD-Conference | 2/8/2016 | 2/9/2016 | 2/9/2016 2:18:58 PM | P | PEND |
|
|
would like call ahead; TJ Phone #: ###-####, conf with Bruce Poe, architect on firewalls,, need to get detail to plan review
|
BLD15-03709
| BLD-Framing/Rough-in | 2/8/2016 | 2/9/2016 | 2/9/2016 1:18:12 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD15-04377
| BLD-Conference | 2/8/2016 | 2/9/2016 | 2/9/2016 11:45:38 AM | A | PASS |
|
|
would like call ahead; Jenkins Phone #: ###-####,, ?s on design method,, ok pending architect
|
BLD15-01528
| BLD-Framing/Rough-in | 2/8/2016 | 2/9/2016 | 2/9/2016 11:43:55 AM | A | PART |
|
|
Phil Phone #: ###-####,, walls ok to insulate,, need sprinkler pass prior to cover
|