Inspections for the day of: Tuesday, February 9, 2016.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-01806 FIRE-Final Inspection2/9/20162/9/20162/9/2016 2:31:06 PMPPASS
Previously noted items corrected/repaired. No fire sprinklers, no fire alarms, fire extinuishers have current inspection tag. Life fire safety inspection passed/complete
FIR15-00878 INSP-Supply line flush2/9/20162/9/20162/9/2016 1:57:58 PMPPASS
Underground supply line flush complete. Discussed cabinet where riser is going to be, approved drawings show head it area. Cabinet area small enough to all removal of sprinkler head.
BLD15-03507 FIRE-Final Inspection2/8/20162/9/20162/9/2016 10:08:21 AMAPASS
No fire sprinklers, no fire alarms, hood suppression inspection complete, fire extinguishers have current tags. Life fire safety passed/complete.
FIR16-00043 INSP-Sprinkler Rough-in2/8/20162/9/20162/9/2016 9:25:32 AMAPASS
Rough to cover inspection passed/complete for overhead fire sprinkler piping, approved for cover
FIR15-00769 INSP-Sprinkler Rough-in2/8/20162/9/20162/9/2016 9:18:49 AMAPASS
Rough to cover inspection complete, notated areas with red ink on city approved drawings, all area's approved for cover.
BLD15-03029 FIRE-Final Inspection2/10/20162/9/20162/9/2016 12:00:00 AMPDONE
as per Jim Page-final was called in on the demo not this permit-see BLD15-03507 for sign off