Inspections for the day of: Friday, February 9, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00018 INSP-Final Inspection2/9/20182/9/20182/9/2018 4:08:53 PMPCANC
Wrong permit request generated, this inspection request is cancelled.
FIR17-00730 INSP-Final Inspection2/9/20182/9/20182/9/2018 4:07:01 PMPPART
Partial final fire sprinkler inspection complete, sprinkler heads need to be installed in verizon room located in the basement level, all other areas are complete for final fire sprinkler inspection.
FIR15-00088 INSP-Conference2/8/20182/9/20182/9/2018 3:46:43 PMPDONE
Fire conferenc complete.
BLD18-00065 FIRE-Final Inspection2/9/20182/9/20182/9/2018 2:27:27 PMPPART
Fire sprinkler inspection complete for scope of work areas, fire alarm inspection partially complete, contractor is waiting for parts to shunt trip elevator, fire extinguishers are in place with current inspection tags in scope of work areas. Partial completion for life fire safety for TCO, elevator shunt will be tested when install is complete.
BLD17-03243 FIRE-Final Inspection2/9/20182/9/20182/9/2018 2:27:12 PMPPART
Fire sprinkler inspection complete for scope of work areas, fire alarm inspection partially complete, contractor is waiting for parts to shunt trip elevator, fire extinguishers are in place with current inspection tags in scope of work areas. Partial completion for life fire safety for TCO, elevator shunt will be tested when install is complete.
FIR16-00383 INSP-Alarm Testing2/9/20182/9/20182/9/2018 2:17:55 PMPDONE
Fire alarm testing for levels 3 and 4 complete.
FIR17-00224 INSP-Sprinkler Rough-in2/9/20182/9/20182/9/2018 12:41:47 PMPPASS
Rough in inspection for overhead fire sprinkler pipig complete, sway bracing on main in middle part of building exceeds length for piping installed, piping will need to upsized to be compliant. Verfication of sway brace repair will be made at final inspection.
FIR17-00224 INSP-Sprinkler Rough-in/Hydro2/8/20182/9/20182/9/2018 12:39:37 PMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure observed at contractor provided gauge at riser location.
FIR18-00080 INSP-Sprinkler Rough-in2/8/20182/9/20182/9/2018 12:20:20 PMAPART
Rough to cover inspection for overhead fire sprinkler located above hardlid in conference room complete, conference room hardlid approved for cover.
FIR18-00099 INSP-Final Inspection2/8/20182/9/20182/9/2018 11:57:10 AMAPASS
Final commercial hood fire suppression system inspection complete.
FIR18-00032 INSP-Final Inspection2/9/20182/9/20182/9/2018 10:04:50 AMAPART
Fire alarm notification complete, fire sprinkler riser monitoring complete, elevator recall complete, remaining item to test is the elevator shunt.
FIR18-00032 INSP-Alarm Testing2/8/20182/9/20182/9/2018 10:03:18 AMADONE
FIre alarm testing complete.