PLM99-03053
| Final | 2/29/2000 | 3/1/2000 | 3/1/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 11:32:55. Contact: . test valves- install signs- repair leak pump vault. 3/2/00 8:52:31 AM
|
PLM00-00534
| Plumbing Rough-in | 2/29/2000 | 3/1/2000 | 3/1/2000 12:00:00 AM | A | PASS |
|
|
first half of the duplex.... Rick ###-#### One side of duplex R/I ok 3/2/00 8:52:11 AM
|
PLM00-00434
| Plumbing Rough-in | 3/1/2000 | 3/1/2000 | 3/1/2000 12:00:00 AM | P | PASS |
|
|
###-#### Outside sewer and water lines ok. 3/2/00 8:52:43 AM
|