Inspections for the day of: Wednesday, March 1, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00157 BLD-Framing/Rough-in2/29/20003/1/20003/1/2000 12:00:00 AMAPASS
###-####
BLD99-03538 BLD-Foundation2/29/20003/1/20003/1/2000 12:00:00 AMAPASS
donny ###-#### Utilized retaining wall engineering for all walls over 2'. 3/1/00 11:38:07 AM
BLD00-00010 BLD-Framing/Rough-in2/29/20003/1/20003/1/2000 12:00:00 AMAPASS
Rick ###-####
BLD00-00328 BLD-Footing2/29/20003/1/20003/1/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/29/2000 at 10:00:49. Contact: ###-####. for ft
BLD00-00059 BLD-Framing/Rough-in2/29/20003/1/20003/1/2000 12:00:00 AMPFAIL
russ ###-#### as per russ 2nd trip- not stapled off per plan- HD's only w/1/2 nut. 3/2/00 8:48:39 AM
BLD99-03161 BLD-Framing/Rough-in3/1/20003/1/20003/1/2000 12:00:00 AMPPASS
###-####
BLD00-00362 BLD-Footing3/1/20003/1/20003/1/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/01/2000 at 09:10:41. Contact: . No approved plan on site, boards laying on dirt & no rebar in place. Unable to check setbacks- (no lines or pins). 3/2/00 8:47:52 AM
BLD99-03642 BLD-Final3/1/20003/1/20003/1/2000 12:00:00 AMPPASS
Mike Brown ###-####
BLD00-00157 BLD-Energy code compliance3/1/20003/1/20003/1/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/01/2000 at 10:30:24. Contact: ###-####.
BLD99-03709 BLD-Wall cover3/1/20003/1/20003/1/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/01/2000 at 11:18:18. Contact: . shear ok. 3/2/00 8:47:13 AM
BLD99-03581 BLD-Framing/Rough-in3/1/20003/1/20003/1/2000 12:00:00 AMPPART
Interior framing corrections made ok. Need exterior shear finished and energy code inspection.