PLM00-02080
| Final | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 3/1/2001 9:14:53 AM final ok
|
PLM00-01644
| Final | 2/28/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 330 On 2/28/2001 9:29:58 AM rp on pressure washer for final, final ok 3/1/2001 9:01:24 AM
|
PLM01-00067
| Final | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | P | FAIL |
|
|
###-#### contractor called in the wrong permit number 3/1/2001 3:02:48 PM
|
PLM01-00498
| Water and/or Sewer | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | P | PASS |
|
|
sewer line Bob ###-####
|
PLM01-00514
| Plumbing Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 3/1/2001 2:11:12 PM gw ok 3/1/2001 2:42:24 PM
|
PLM00-00067
| Final | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 3/1/2001 3:55:01 PM final ok
|