PLM00-04099
| Plumbing Rough-in | 2/28/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 13:27:53. Contact: ###-####. water, waste and vents test failed. need to support upstairs big tud drain arm. 3/1/2001 9:44:02 AM
|
PLM01-00496
| Water and/or Sewer | 2/28/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-00121
| Final | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | A | NR |
|
|
Rob Rogers ###-#### called for PM inspection. 3/1/2001 1:44:27 PM
|
PLM01-00145
| Final | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-00121
| Final | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 360 On 3/1/2001 9:22:15 AM tub and shower trims not set. need to caulk fixtures to counter tops walls and floors. 3/1/2001 3:38:23 PM
|
PLM01-00510
| Water and/or Sewer | 3/1/2001 | 3/1/2001 | 3/1/2001 12:00:00 AM | P | PASS |
|
|
###-####
|