Inspections for the day of: Thursday, March 1, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01487 BLD-Framing/Rough-in2/28/20013/1/20013/1/2001 12:00:00 AMAFAIL
###-#### c/n still governs 3/1/2001 10:54:35 AM
BLD00-01487 BLD-Energy code compliance2/28/20013/1/20013/1/2001 12:00:00 AMAPASS
BLD00-01488 BLD-Framing/Rough-in2/28/20013/1/20013/1/2001 12:00:00 AMAFAIL
c/n still governs 3/1/2001 10:54:18 AM
BLD00-03400 BLD-Framing/Rough-in2/27/20013/1/20013/1/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/27/2001 at 14:49:01. Contact: ###-####.
need 2 straps in garage, brace in attic trusses, ok to insulate 3/1/2001 9:13:50 AM
MIS01-00032 BLD-Conference2/28/20013/1/20013/1/2001 12:00:00 AMAPASS
###-####,,,all apears like maint. problems, problem w/ flat roof leaking and a brace had to be put in living room ceiling to hold it up, may be rafters failing or just wet sheetrock, I could not tell w/ out exposing. Other problems were toilet, dishwasher, and sewer cap that was off outside (on now) that was leaking. No action taken at this point. 3/1/2001 9:45:41 AM
BLD00-03185 BLD-Concrete2/28/20013/1/20013/1/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/28/2001 at 16:17:32. Contact: ###-####.
pending mti report 3/1/2001 9:58:46 AM
BLD00-01488 BLD-Framing/Rough-in3/1/20013/1/20013/1/2001 12:00:00 AMPPASS
Scheduled by Inspector: 415 On 3/1/2001 10:49:54 AM
BLD00-01487 BLD-Framing/Rough-in3/1/20013/1/20013/1/2001 12:00:00 AMPPASS
Scheduled by Inspector: 415 On 3/1/2001 10:49:32 AM
MEC01-00598 Rough-in2/28/20013/1/20013/1/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 02/28/2001 at 13:06:01. Contact: ###-####.done by 411 3/1/2001 10:58:51 AM
BLD00-01488 BLD-Energy code compliance2/28/20013/1/20013/1/2001 12:00:00 AMPPASS
BLD00-03647 BLD-Foundation2/28/20013/1/20013/1/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/28/2001 at 15:15:25. Contact: ###-####.
work in progress, looks ok so far 3/1/2001 2:27:28 PM