Inspections for the day of: Friday, March 1, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-02564 Final2/28/20023/1/20023/1/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/28/2002 at 15:11:07. Contact: ###-####.
PLM01-02976 Plumbing Rough-in2/28/20023/1/20023/1/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/28/2002 at 15:12:02. Contact: ###-####. water undersized in one unit, glue 1 1/2" 90 and coupling, 3" 90, n.p. and isolators 3/1/2002 12:05:05 PM
PLM02-00474 Water and/or Sewer2/28/20023/1/20023/1/2002 12:00:00 AMAPART
Scheduled by Inspector: 330 On 2/28/2002 5:57:35 PM part ok the abs/pvc joint is ok and the drain in the equipment shed is nonexistant, will call for reinspection when the interceptor is complete 3/1/2002 10:45:02 AM
PLM01-03729 Water and/or Sewer2/28/20023/1/20023/1/2002 12:00:00 AMAPART
Scheduled by Inspector: 330 On 2/28/2002 5:57:10 PM offset up the hill complete 3/1/2002 10:53:11 AM
PLM02-00483 Groundwork3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/01/2002 at 07:40:28. Contact: ###-####. did this yesterday late, jim didn't think i made it. 3/1/2002 8:18:24 AM
PLM02-00492 Sprinkler (Final)3/1/20023/1/20023/1/2002 12:00:00 AMPPART
###-####
PLM02-00409 Plumbing Rough-in3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/01/2002 at 09:08:10. Contact: ###-####.
PLM01-03240 Groundwork3/1/20023/1/20023/1/2002 12:00:00 AMPPART
for grids 9 & e-donny ###-#### partial gw ok 3/1/2002 2:51:22 PM
PLM02-00496 Water and/or Sewer3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
###-#### serena
PLM01-03240 Groundwork3/1/20023/1/20023/1/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/01/2002 at 09:22:18. Contact: ###-####. doubled up on inspection requests 3/1/2002 2:51:52 PM
PLM02-00490 Groundwork3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
carlos ###-####
PLM01-03729 Water and/or Sewer3/1/20023/1/20023/1/2002 12:00:00 AMPPART
Scheduled by Inspector: 330 On 3/1/2002 10:53:23 AM made the connection 3/1/2002 4:32:53 PM
PLM02-00494 Water and/or Sewer3/1/20023/1/20023/1/2002 12:00:00 AMPFAIL
###-#### MARY remove stop and waste from future sprinkler connection 3/1/2002 2:52:40 PM
PLM01-02976 Plumbing Rough-in3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
Scheduled by Inspector: 330 On 3/1/2002 12:05:24 PM
PLM02-00494 Water and/or Sewer3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
Scheduled by Inspector: 330 On 3/1/2002 2:53:06 PM