Inspections for the day of: Friday, March 1, 2002.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-03627 Final3/1/20023/1/20023/1/2002 12:00:00 AM PASS
BLD01-02442 BLD-Final2/28/20023/1/20023/1/2002 12:00:00 AMAPART
Pat ###-#### struct appears ok, need soils report/bond/p.wks ok. 3/1/2002 10:11:40 AM
BLD01-02048 BLD-Final2/28/20023/1/20023/1/2002 12:00:00 AMANR
###-#### keep c/n , need fire ok3/1/2002 11:19:49 AM 3/1/2002 11:20:28 AM
BLD01-02049 BLD-Final2/28/20023/1/20023/1/2002 12:00:00 AMAFAIL
###-#### keep c/n , need fire ok3/1/2002 11:19:58 AM 3/1/2002 11:20:17 AM
BLD00-01492 BLD-Final2/28/20023/1/20023/1/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/28/2002 at 16:31:08. Contact: ###-####...c/n, air seal, grading/retaining wall; patch/seal 1hr separations. 3/1/2002 11:06:36 AM
BLD01-02822 BLD-Wall cover2/28/20023/1/20023/1/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 02/28/2002 at 16:33:01. Contact: ###-####...keep c/n re firewalls , etc. 3/1/2002 2:52:08 PM
BLD01-00594 BLD-Conference2/28/20023/1/20023/1/2002 12:00:00 AMANR
Scheduled by Inspector: 340 On 2/28/2002 5:12:17 PM 8694101
BLD01-03006 BLD-Framing/Rough-in2/28/20023/1/20023/1/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 340 On 2/28/2002 5:26:13 PM c/n: seal corridor penetrations, landing at storage 3/1/2002 12:16:24 PM
BLD01-03061 BLD-Framing/Rough-in2/28/20023/1/20023/1/2002 12:00:00 AMAPASS
Scheduled by Inspector: 340 On 2/28/2002 6:01:26 PM michelle ###-####
MEC02-00597 Conference2/28/20023/1/20023/1/2002 12:00:00 AMAPASS
Scheduled by Inspector: 340 On 2/28/2002 6:03:07 PM 8693120 w/ contractor re sealing supply duct...use mastic or foil tape. 3/1/2002 11:17:12 AM
BLD01-01621 BLD-Final3/1/20023/1/20023/1/2002 12:00:00 AMPPART
###-####...c/n, ok for t/o ; verify pub wks, code enf...3/1/2002 4:52:20 PM 3/1/2002 5:07:07 PM
BLD01-02875 BLD-Framing/Rough-in3/1/20023/1/20023/1/2002 12:00:00 AMPNR
###-#### go to the construction trailer
BLD01-02267 BLD-Conference3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/01/2002 at 10:05:11. Contact: ###-####. w/ Larry Hansen...may need permit for art work supports near escalator. Consult plans review. 3/1/2002 5:08:25 PM
BLD01-03163 BLD-Conference3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
###-#### provide dbl 1hr walls , int layer gyp3/1/2002 4:48:23 PM 3/1/2002 4:49:51 PM
BLD01-03061 BLD-Energy code compliance3/1/20023/1/20023/1/2002 12:00:00 AMPPART
Scheduled by Inspector: 340 On 3/1/2002 11:16:19 AM 8679094 walls ok to cover. 3/1/2002 5:08:45 PM 3/1/2002 5:09:03 PM
BLD01-03222 BLD-Final2/28/20023/1/20023/1/2002 12:00:00 AMPPASS
JOHN ###-####