MEC01-03627
| Final | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | | PASS |
|
|
|
BLD01-02442
| BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PART |
|
|
Pat ###-#### struct appears ok, need soils report/bond/p.wks ok. 3/1/2002 10:11:40 AM
|
BLD01-02048
| BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | NR |
|
|
###-#### keep c/n , need fire ok3/1/2002 11:19:49 AM 3/1/2002 11:20:28 AM
|
BLD01-02049
| BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | FAIL |
|
|
###-#### keep c/n , need fire ok3/1/2002 11:19:58 AM 3/1/2002 11:20:17 AM
|
BLD00-01492
| BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 16:31:08. Contact: ###-####...c/n, air seal, grading/retaining wall; patch/seal 1hr separations. 3/1/2002 11:06:36 AM
|
BLD01-02822
| BLD-Wall cover | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 16:33:01. Contact: ###-####...keep c/n re firewalls , etc. 3/1/2002 2:52:08 PM
|
BLD01-00594
| BLD-Conference | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | NR |
|
|
Scheduled by Inspector: 340 On 2/28/2002 5:12:17 PM 8694101
|
BLD01-03006
| BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 340 On 2/28/2002 5:26:13 PM c/n: seal corridor penetrations, landing at storage 3/1/2002 12:16:24 PM
|
BLD01-03061
| BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 2/28/2002 6:01:26 PM michelle ###-####
|
MEC02-00597
| Conference | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 2/28/2002 6:03:07 PM 8693120 w/ contractor re sealing supply duct...use mastic or foil tape. 3/1/2002 11:17:12 AM
|
BLD01-01621
| BLD-Final | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | PART |
|
|
###-####...c/n, ok for t/o ; verify pub wks, code enf...3/1/2002 4:52:20 PM 3/1/2002 5:07:07 PM
|
BLD01-02875
| BLD-Framing/Rough-in | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | NR |
|
|
###-#### go to the construction trailer
|
BLD01-02267
| BLD-Conference | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 10:05:11. Contact: ###-####. w/ Larry Hansen...may need permit for art work supports near escalator. Consult plans review. 3/1/2002 5:08:25 PM
|
BLD01-03163
| BLD-Conference | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | PASS |
|
|
###-#### provide dbl 1hr walls , int layer gyp3/1/2002 4:48:23 PM 3/1/2002 4:49:51 PM
|
BLD01-03061
| BLD-Energy code compliance | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 340 On 3/1/2002 11:16:19 AM 8679094 walls ok to cover. 3/1/2002 5:08:45 PM 3/1/2002 5:09:03 PM
|
BLD01-03222
| BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | PASS |
|
|
JOHN ###-####
|