MEC01-01821
| Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PART |
|
|
east side of sanctuary ok 3/1/2002 11:37:20 AM
|
MEC02-00478
| Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PASS |
|
|
###-####-ron
|
MEC02-00597
| Pressure Test | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | FAIL |
|
|
gage on zero 3/1/2002 9:29:40 AM
|
MEC02-00592
| Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 15:01:21. Contact: ###-####.
|
MEC02-00591
| Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 15:02:20. Contact: ###-####.
|
MEC02-00198
| Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | FAIL |
|
|
locked 3/1/2002 10:39:51 AM
|
MEC01-03749
| Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 408 On 2/28/2002 4:56:21 PM
|
MEC01-03903
| Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | FAIL |
|
|
locked 3/1/2002 10:27:40 AM
|
MEC01-03659
| Final | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 408 On 2/28/2002 5:00:16 PM
|
MEC02-00408
| Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | A | FAIL |
|
|
c/n posted, pt ok only 3/1/2002 12:08:14 PM
|
MEC01-03740
| Final | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | FAIL |
|
|
c/n posted 3/1/2002 3:47:23 PM
|
MEC02-00415
| Pressure Test | 3/1/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 08:39:18. Contact: ###-####.
|
MEC02-00371
| Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | FAIL |
|
|
c/n posted at front window 3/1/2002 1:31:22 PM
|
MEC02-00371
| Pressure Test | 2/28/2002 | 3/1/2002 | 3/1/2002 12:00:00 AM | P | PART |
|
|
pt ok, no pipe sizing 3/1/2002 1:30:53 PM
|