Inspections for the day of: Friday, March 1, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00605 Pressure Test2/28/20023/1/20023/1/2002 12:00:00 AMAFAIL
###-####
BLD02-00280 BLD-Final2/28/20023/1/20023/1/2002 12:00:00 AMAFAIL
###-#### jack c/n on site 3/1/2002 11:31:19 AM
BLD01-03058 BLD-Framing/Rough-in2/28/20023/1/20023/1/2002 12:00:00 AMAPASS
JOHN ###-#### ok to cover also int shear panels ok 3/1/2002 10:58:18 AM
MEC01-03012 Final2/28/20023/1/20023/1/2002 12:00:00 AMANH
###-####
MIS02-00027 BLD-Final2/26/20023/1/20023/1/2002 12:00:00 AMAPASS
###-#### berry ok for perm occ as per approved plans 3/1/2002 9:42:31 AM
BLD01-03199 BLD-Final2/27/20023/1/20023/1/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 02/27/2002 at 19:26:51. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/01/2002 at 07:03:23.
BLD01-03264 BLD-Framing/Rough-in2/28/20023/1/20023/1/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 407 On 2/28/2002 5:34:46 PM c/n on site 3/1/2002 1:03:14 PM
MEC02-00582 Pressure Test2/28/20023/1/20023/1/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/28/2002 at 18:03:27. Contact: ###-####.
BLD01-01188 BLD-Final3/1/20023/1/20023/1/2002 12:00:00 AMPFAIL
###-#### travis garage code 0912 c/n on site 3/1/2002 2:29:53 PM
MEC02-00618 Pressure Test3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
###-####
BLD01-03266 BLD-Framing/Rough-in3/1/20023/1/20023/1/2002 12:00:00 AMPFAIL
###-#### fixed one but still have one to do 3/1/2002 2:03:57 PM
MEC01-03012 Final3/1/20023/1/20023/1/2002 12:00:00 AMPPASS
todd- ###-#### fn-re-insp
MEC02-00572 Pressure Test2/28/20023/1/20023/1/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/28/2002 at 17:25:26. Contact: ###-####.
BLD01-02788 BLD-Footing2/28/20023/1/20023/1/2002 12:00:00 AMPNR
###-####
BLD01-03105 BLD-Wall cover2/28/20023/1/20023/1/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/28/2002 at 16:48:20. Contact: ###-####.ok to cover framing 3/1/2002 5:12:07 PM