Inspections for the day of: Tuesday, March 1, 2005.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00723 FIR-Aging Inspection3/1/20053/1/20053/1/2005 12:00:00 AM NR
Work in progress waiting for alarms 3/2/2005 2:26:23 PM
FIR04-00657 INSP-Final Inspection2/28/20053/1/20053/1/2005 12:00:00 AMAPART
Temporary occupancy given. Fire alarm panel and NAC panels inspected. Duct detectors on the sixth floor inspected. Induct detectors at main supply and returns on first through sixth floor inspected. Pull stations on all floors inspected. Audio visuals on sixth floor and first floor lobby inspected. Individual a/v's on first through sixth and basement inspected. All sprinkler monitoring points inspected. All other items not inspected. Plans will need to be resubmitted with changes which include ceiling mounted a/v's, deletion of pull on sixth floor, additional heat in penthouse and relocated NAC panels. 3/1/2005 2:53:28 PM
FIR04-00658 INSP-Final Inspection2/28/20053/1/20053/1/2005 12:00:00 AMAPART
Temporary occupancy given. Fire alarm panel and NAC panels inspected. Duct detectors on the sixth floor inspected. Induct detectors at main supply and returns on first through sixth floor inspected. Pull stations on all floors inspected. Audio visuals on sixth floor and first floor lobby inspected. Individual a/v's on first through sixth and basement inspected. All sprinkler monitoring points inspected. All other items not inspected. Plans will need to be resubmitted with changes which include ceiling mounted a/v's, deletion of pull on sixth floor, additional heat in penthouse and relocated NAC panels. 3/1/2005 2:53:34 PM
FIR05-00051 INSP-Final Inspection2/28/20053/1/20053/1/2005 12:00:00 AMAPART
Temporary occupancy given. Fire alarm panel and NAC panels inspected. Duct detectors on the sixth floor inspected. Induct detectors at main supply and returns on first through sixth floor inspected. Pull stations on all floors inspected. Audio visuals on sixth floor and first floor lobby inspected. Individual a/v's on first through sixth and basement inspected. All sprinkler monitoring points inspected. All other items not inspected. Plans will need to be resubmitted with changes which include ceiling mounted a/v's, deletion of pull on sixth floor, additional heat in penthouse and relocated NAC panels. 3/1/2005 2:53:41 PM
FIR05-00052 INSP-Final Inspection2/28/20053/1/20053/1/2005 12:00:00 AMAPART
Temporary occupancy given. Fire alarm panel and NAC panels inspected. Duct detectors on the sixth floor inspected. Induct detectors at main supply and returns on first through sixth floor inspected. Pull stations on all floors inspected. Audio visuals on sixth floor and first floor lobby inspected. Individual a/v's on first through sixth and basement inspected. All sprinkler monitoring points inspected. All other items not inspected. Plans will need to be resubmitted with changes which include ceiling mounted a/v's, deletion of pull on sixth floor, additional heat in penthouse and relocated NAC panels. 3/1/2005 2:53:50 PM
FIR04-00809 INSP-Sprinkler Rough-in/Hydro3/1/20053/1/20053/1/2005 12:00:00 AMPFAIL
See approved plans for locations that require corrections. 3/1/2005 4:01:39 PM
BLD04-00079 FIRE-Conference3/1/20053/1/20053/1/2005 12:00:00 AMPDONE
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
BLD04-01308 FIRE-Conference3/1/20053/1/20053/1/2005 12:00:00 AMPDONE
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
BLD04-01836 FIRE-Conference3/1/20053/1/20053/1/2005 12:00:00 AMPDONE
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
BLD04-01885 FIRE-Conference3/1/20053/1/20053/1/2005 12:00:00 AMPDONE
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
FIR04-00774 INSP-Alarm Testing2/28/20053/1/20052/28/2005 2:12:06 PMACANC
This inspection needs to be at 8am because of tenants. Please let me know if this time will work for you. If not I will reschedule for another morning.. Internet Inspection Request from: Rick Groom Inspection cancelled from web by: Rick Groom