PLM07-00556
| Other | 3/1/2007 | 3/1/2007 | 3/1/2007 4:40:00 PM | P | DONE |
|
|
this was a conferance on a sewer line, hard rock needs to abb a grease interseptor to permit and test grease trap.
|
PLM06-04115
| Plumbing Rough-in | 3/1/2007 | 3/1/2007 | 3/1/2007 4:02:13 PM | P | PASS |
|
|
Jeff pls call 45 min prior to inspection; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
PLM06-02370
| Other | 3/1/2007 | 3/1/2007 | 3/1/2007 3:41:08 PM | P | DONE |
|
|
Greg Conference; Phone #: ###-#### Internet Inspection Request from: Stacie Backus-this was a conferance on how to install a water service.
|
PLM06-03057
| Plumbing Rough-in | 2/28/2007 | 3/1/2007 | 3/1/2007 2:31:31 PM | P | PASS |
|
|
Please inspect grease interceptor near B-wing. Thanks. Phone #: ###-####
|
PLM06-03263
| Final | 3/1/2007 | 3/1/2007 | 3/1/2007 2:04:52 PM | P | PART |
|
|
Phone #: ###-####-t&p needs 1" airgap, a dbcv in the vertical the direction of flow needs to be up, not down. set dishwasher, no water to north side sink, dbcv needs tested & certifed
|
PLM07-00542
| Sprinkler (Final) | 2/28/2007 | 3/1/2007 | 3/1/2007 10:47:53 AM | A | PASS |
|
|
rene-- ###-####
|
PLM06-04013
| Final | 2/28/2007 | 3/1/2007 | 3/1/2007 9:58:57 AM | A | PASS |
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
PLM07-00399
| Groundwork | 2/27/2007 | 3/1/2007 | 3/1/2007 9:09:39 AM | A | PASS |
|
|
Basement addition/remodel Phone #: ###-####
|